Maze Hill, London

For this project, the structure was first prepared with a Licata LBS Chalk White 1.2mm finish, creating a smooth and durable surface before the installation of the copings. This high-performance coating provides excellent weather resistance and a clean, uniform appearance.

To complete the installation, powder-coated aluminium copings were fitted, offering a sleek and protective edge. The powder coating enhances durability by preventing corrosion and fading, ensuring a long-lasting, low-maintenance finish.

For a flawless look, the copings were manufactured with welded corners, eliminating visible joints and providing a seamless, professional finish. This not only improves aesthetics but also enhances water resistance, preventing potential leaks or structural wear over time.

Previous
Previous

Leeds Village, Maidstone, Kent

Next
Next

Bredgar, Sittingbourne